What happens on fibre installation day
A fibre installation is a straightforward job for our technicians, but it involves work on your property and it helps to know what to expect.
This guide walks through the whole process, including how long it takes and the decisions you’ll be asked to make on the day.
Typical timelines
| Stage | Typical duration |
|---|---|
| Coverage confirmation after you enquire | Usually within 1 working day |
| Quotation issued after coverage confirmed | 1–2 working days |
| Installation booked after you approve | Most homes within 1–3 working days |
| The installation itself | 1–3 hours for a typical home |
| Business installations requiring a site survey | Longer — we confirm a timeline upfront |
Properties that need a longer cable run, wayleave permission from a landlord or body corporate, or work across a public road may take longer. We tell you as soon as we know rather than letting a date slip quietly.
What we need from you
- Someone over 18 present for the whole visit, to agree cable routes and sign the handover.
- Permission to do the work. If you rent, or live in a complex or estate, written permission from the landlord or body corporate may be required before we can drill or run cable. Arrange this in advance — it is the most common cause of a wasted visit.
- Access to the route. The outside wall, the roof space or a distribution point may need to be reached. Clear the way and secure any pets.
- A power point near where the ONT and router will be mounted.
- A decision on placement. Have a rough idea where you want the equipment before we arrive.
The installation, step by step
- Arrival and survey. The technician introduces themselves, confirms your details and walks the property with you to plan the cable route and equipment position. Nothing is drilled until you have agreed the plan.
- Running the drop cable. The fibre is run from our nearest distribution point to your building — overhead or underground depending on the infrastructure in your area. This is usually the longest part of the job.
- Entry into the building. A small hole is drilled through the wall at the agreed point and sealed afterwards. The cable is secured neatly along its route.
- Terminating the fibre. The technician splices or terminates the fibre and connects it to the ONT. This is precision work and can’t be rushed.
- Mounting and powering the ONT. The ONT is fixed to the wall and powered. Its lights confirm the optical connection is good.
- Router setup. Your router is connected, configured and your Wi-Fi network name and password are set.
- Testing. The technician tests the line speed, confirms it meets your package and checks the Wi-Fi reaches the rooms you need.
- Handover. You’re shown the equipment, told what the lights mean and given your Wi-Fi details. Then you sign to confirm the work is complete.
The route and equipment position are agreed with you at the start, and that’s the moment to say if you’d rather the cable came in somewhere else or the ONT went on a different wall. Changing it afterwards means new holes and, potentially, a charge.
After the technician leaves
- Write down your Wi-Fi name and password and keep them somewhere findable.
- Connect your main devices and check the signal in the rooms that matter.
- Run a speed test with a laptop plugged into the router, and note the result as a baseline.
- Change the default Wi-Fi password — see how to change it.
- Log in to the client portal to confirm your account details are correct.
Who owns the equipment
The fibre cable, its termination and the ONT remain the property of Flexi Networks. They stay with the property if you move and must be returned or left in place when service ends. The router may be included with your package or supplied separately — your service agreement sets out which. Please don’t attempt to remove, relocate or modify any of it yourself.
Fibre connectors must stay perfectly clean and the cable must never be bent sharply. Unplugging, cleaning or rerouting fibre yourself will almost certainly break the connection and may result in a call-out charge. If something needs moving, ask us.
On this page
Related articles
Still need help?
Our support team is based in Eswatini and happy to walk you through it.